2–4 Jaques Avenue, Bondi Beach

Client:
Hoz Constructions
Location:
Bondi
Project Duration:
1 year
![244 - 254 Alison Road, Randwick[92].jpg](https://static.wixstatic.com/media/465807_97035154a5274afb93ab07673da1c597~mv2.jpeg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/2-4Jaque%20StreetC.jpeg)
Project Overview:
Projex Fire was contracted by HOZ Constructions to deliver the complete fire protection package for a new six-storey mixed-use development at Bondi Beach. Our role included the design coordination, installation, and certification of wet and dry fire systems in accordance with NCC and AS standards.
Scope of Works:
Installed new sprinkler and FIP systems including alarms and detection networks.
Installed compliant passive fire protection systems to seal penetrations across all levels.
Applied fire-rated duct wrap (Fyrewrap) to mechanical services within the basement.
Coordinated testing, commissioning, and documentation for OC certification.
Outcome:
All fire systems installed, tested, and certified on schedule.
Building achieved Occupation Certificate with zero defects.
Delivered a seamless, coordinated handover to HOZ Constructions.